Shandong Mactolli Aluminum formwork Engineering & Technology
Search
Confirm
Cancel
关于我们

News

Check category

Details

China Construction Eighth Engineering Co., Ltd. Accepted Jinan Budong Project

  • Categories:Company news
  • Author:
  • Origin:
  • Time of issue:2019-05-29 16:29
  • Views:

(Summary description)On March 16, 2019, a group of 10 people from China Construction Eighth Engineering Co., Ltd. came to our company for acceptance of the Jinan Budong project. This acceptance is the final check before delivery. On the same day, the engineering acceptance personnel went to the assembly site of Maxtorin to check the comprehensive performance of the aluminum template, including the strength and welding quality, carefully checked the engineering drawings, and checked the joint gap between the two templates. , The height difference of adjacent templates, the flatness of the template surface and other details have been inspected. During the acceptance period, the quality of our products has been highly recognized by customers. The customers expressed that they will establish a deep and lasting cooperative relationship with our company. Achieve complementary win-win and common development in cooperative projects.

China Construction Eighth Engineering Co., Ltd. Accepted Jinan Budong Project

(Summary description)On March 16, 2019, a group of 10 people from China Construction Eighth Engineering Co., Ltd. came to our company for acceptance of the Jinan Budong project.
This acceptance is the final check before delivery. On the same day, the engineering acceptance personnel went to the assembly site of Maxtorin to check the comprehensive performance of the aluminum template, including the strength and welding quality, carefully checked the engineering drawings, and checked the joint gap between the two templates. , The height difference of adjacent templates, the flatness of the template surface and other details have been inspected. During the acceptance period, the quality of our products has been highly recognized by customers. The customers expressed that they will establish a deep and lasting cooperative relationship with our company. Achieve complementary win-win and common development in cooperative projects.

  • Categories:Company news
  • Author:
  • Origin:
  • Time of issue:2019-05-29 16:29
  • Views:
Information
On March 16, 2019, a group of 10 people from China Construction Eighth Engineering Co., Ltd. came to our company for acceptance of the Jinan Budong project.
This acceptance is the final check before delivery. On the same day, the engineering acceptance personnel went to the assembly site of Maxtorin to check the comprehensive performance of the aluminum template, including the strength and welding quality, carefully checked the engineering drawings, and checked the joint gap between the two templates. , The height difference of adjacent templates, the flatness of the template surface and other details have been inspected. During the acceptance period, the quality of our products has been highly recognized by customers. The customers expressed that they will establish a deep and lasting cooperative relationship with our company. Achieve complementary win-win and common development in cooperative projects.

Scan the QR code to read on your phone

Shandong Mactolli Aluminum formwork Engineering & Technology

© Shandong Mactolli Aluminum formwork Engineering & Technology Co.,Ltd. 

Address: Conglin Industrial District, Longkou City, Shandong

Contact person: manager Liu  Mobile phone: +86-13853561529
Tel: +86-535-8562975   E-mail: 13854523929@163.com

ICP: 14011465 Powered by: www.300.cn

Links:

> cnal.com  oceanhammer

> clfh      > conglinpml

 

Shandong Mactolli Aluminum formwork Engineering & Technology

Shandong Mactolli Aluminum formwork Engineering & Technology